Your First Idea to Completion

Gwen Roberts

Share this article

How we guide you through your project: 

Starting a project can feel overwhelming? Whether you are planning a new home, an extension, renovation or larger development, there are a lot of decisions to make, from the initial design through to planning, construction and completion.


Our role is to guide you through that process, bringing together design, technical knowledge and project coordination to help turn your ideas into a building that works for you.

We break the process down into clear stages from the RIBA Plan of Work, so you know what is happening, what we are responsible for and what you can expect from us.


Stage 0 – Getting your project started

Before the design work begins, we get the project set up properly.

This includes the initial admin, establishing the project requirements and making sure we have the information we need to get started. This early stage is important because a well-organised project gives us a clear understanding of what needs to happen and when.


Stage 1 – Understanding your property

Before we start designing, we need to understand the existing building and site.

We carry out a measured survey of the property, along with the necessary site checks. This gives us an accurate basis from which to develop the design. The survey information allows us to understand the existing dimensions, layout and constraints of the property rather than relying on assumptions.


Images from surveys, taken by our team.

Stage 2 – Developing the concept

This is where your ideas start to become a design.

Working from your brief, requirements and aspirations, we prepare concept design drawings for you to review. At this stage, we explore how the spaces could work, how the building could look and how your requirements can be brought together into a coherent design.

We work with you to develop the proposal until we reach an agreed design direction.

Your brief matters, the better we understand what you want to achieve, the better we can design for you. It helps us understand your priorities, how you want to use the space, your budget, your timescale and what is important to you. You don't need to have all the answers at the beginning, part of our role is to ask the right questions and help you establish what you actually need from the project.

3D view of a proposed design for two properties.

Stage 3 – Planning

Once the design has been developed, we can move towards planning.

Planning application-

We develop the design sufficiently to prepare and submit a Planning Application on your behalf. We also deal with relevant queries from the planning authority and other consultees that may arise during the process. Our aim is to make the planning process as straightforward as possible for you, while ensuring the proposals are clearly communicated and supported by the appropriate drawings and information.

Please note: the discharge of planning conditions is not included unless specifically agreed as part of our appointment.

Planning Portal Anglesey logo - https://www.planningportal.co.uk/wales

Ordnance Survey information-

We also prepare the relevant Ordnance Survey (OS) location plan for the planning application.


Stage 4 – Turning the design into a buildable project

Getting planning permission is an important milestone, but it is not the end of the design process. The next step is developing the proposal into a detailed technical design that can be built.

Technical design and Building Regulations-

We prepare the technical drawings, details and layouts needed for Building Regulations approval.

Construction floor plan and section, showing the detail and structural aspects.

This involves coordinating with other consultants, such as the engineers who are involved in the detailed design of the project.

We also respond to queries raised by Building Control and develop the information required by the appointed contractor to carry out the works on site. This is where the project moves from “what could we build?” to “how are we going to build it?”

Principal Designer and Health & Safety-

Where applicable, we undertake the CDM 2015 Principal Designer duties and prepare the Pre-Construction Health & Safety Plan. Health and safety should be considered from the earliest stages of a project, rather than being something addressed once construction has already started.

Our role is to help identify and manage risks through the design process and coordinate the relevant health and safety information.

Stage 5 – Preparing for construction

With the design developed, we can help you prepare for the construction stage.

Energy calculations and technical requirements-

Depending on the project, calculations such as SAP (Standard Assessment Procedure) or EPC-related information may be required as part of Building Regulations approval.

Where these services are required, we coordinate the appropriate information and consultants.

Tender and construction information-

We can also prepare a full schedule of works and tender information for the project. This gives contractors the information they need to price the proposed works and allows you, as the client, to compare quotations on a more consistent basis. Where appropriate, we can also coordinate with a Quantity Surveyor or other cost consultant.

Supporting you during construction-

Once construction begins, our involvement can continue through the build. For projects where this service is included, we attend site and progress meetings to review progress and discuss issues arising during construction.


Two projects on site showing trusses (left) and masonry construction with a large beam opening for a window (right).

Construction rarely goes exactly according to plan, so having your architect involved can provide valuable support when questions or unexpected issues arise.

We can help interpret the drawings, coordinate with the contractor and keep the design intent of the project in view.

Stage 6 – Completion and handover

As the project reaches completion, we help bring the process to a close.

This includes the handover of the building and, where applicable, the preparation and issue of the required Building Safety Act (Wales) Competence Declaration before the Final Certificate can be issued.

The new Building Safety requirements place greater emphasis on competence, responsibility and maintaining appropriate information throughout the project. For clients, this means that choosing the right professionals and keeping good records throughout the project is more important than ever.

Country house featuring modern extensions, a custom glasshouse, and a standalone timber outbuilding.

Stage 7 – After you move in

Our involvement doesn't necessarily have to end when the building is complete.

Where included within our appointment, we can carry out a post-occupancy review once you have had the opportunity to use the building. This gives us the chance to understand how the completed space is working for you in practice and identify any issues that may need to be addressed.

Luxurious ultra-modern coastal residence featuring striking curved glass walls and chic, sun-filled.

A complete service, from idea to reality. From the first conversation about your ideas through to completion, our aim is to make the architectural process clearer, more manageable and less daunting.

Planning a project?

Whether you're thinking about an extension, renovation, new home or larger development, getting architectural advice early can help you understand what is possible, what information is needed and what the project is likely to involve.

Start with your ideas. We'll help you work out the next steps.

Recent posts

by Adrian Williamson • 5 October 2026
What is the Building Safety Act? Everything you need to know The Building Safety Act 2022 coming into force on the 1st July 2026 is the most significant reform of building regulations in a generation. If you are planning a new build, extension, renovation, or development project in Wales, you need to prepare for important changes to the Building Regulations coming into effect on 1 July 2026.  These updates are part of the Welsh Government’s Building Safety Programme and the Building Safety Act 2022. They introduce new requirements for dutyholders and competence declarations that will affect every project submitted from that date. Here's what's changed and what it means for you.
by Adrian Williamson • 5 October 2026
Biodiversity and Building projects: Making room for nature in your plans Every building project, however small, changes a little piece of the natural world. For a long time the planning system treated that as an afterthought. Not any more. In Wales, every planning application now has to show how it is making a positive contribution to nature, and there are some very simple, inexpensive ways to do that which we build into our projects as a matter of course. This post explains what the rules ask for, and then runs through the practical things you can do on your own project, from a hedgehog gap in a fence to the bat barns and owl towers we have designed on Anglesey. What the planning rules now require The latest edition of Planning Policy Wales (Edition 12) requires every planning application in Wales to be accompanied by a Green Infrastructure Statement. The key paragraph, 6.2.5, reads: “A green infrastructure statement should be submitted with all planning applications. This will be proportionate to the scale and nature of the development proposed and will describe how green infrastructure has been incorporated into the proposal. In the case of minor development this will be a short description and should not be an onerous requirement for applicants. The green infrastructure statement will be an effective way of demonstrating positive multi-functional outcomes which are appropriate to the site in question and must be used for demonstrating how the step-wise approach (Paragraph 6.4.21) has been applied.” The important words there are “proportionate” and “should not be an onerous requirement”. For a house extension or a small conversion, the statement is typically a short paragraph or two describing what you are doing for nature, and we prepare it as part of the application. What the planning authority wants to see is that you have thought about it and built something in, rather than bolted it on at the end. The wider legal backdrop is the Environment (Wales) Act 2016 , which places a duty on public bodies to maintain and enhance biodiversity, and Technical Advice Note 5: Nature Conservation and Planning , which explains how that duty is applied through the planning system.
Image of house
by Adrian Williamson • 16 September 2026
Thinking of buying or altering a listed building? Here's what we tell out clients: There’s something special about living in a listed building. You’re not just an owner, you’re a custodian, looking after a piece of history for the people who come after you. That’s a lovely thing, but it also brings a level of responsibility that a modern house simply doesn’t. Alterations are perfectly possible, but they need to be thought through carefully, and there are a few traps for the unwary along the way. We work with listed and historic buildings across Anglesey, Gwynedd and Eryri, and we find ourselves giving the same advice again and again. So here it is, in one place.

Thinking about your next project?